Phoenix, Nevada, USA (Phoneix) Gold Mine

In March 2006 the first gold shipment Sinotrans. Design production capacity: processing ore volume of 31,750 tons / day. It is expected to produce 350,000 ounces/year of gold and 9000 to 11250 tons/year of copper . Mine open manner in mining, mineral flotation and hydrometallurgical methods. The ore reserves/resources amounted to 314,488,100 tons, the average grade: gold 0.98 g / ton, copper 0.15%, converted to a rough gold reserves of 8.95 million ounces, copper reserves of 420,000 tons. Newmont Mining owns 100% of the shares. (Source: Resource Network)

6.5 Ton Crawler Excavator

SD65E small Crawler Excavator is one of the earliest models studied in our factory. The system is mature and stable, the excavation is powerful and the failure rate is low.

This SD65E small excavator weighs about 5880kg

relatively small and flexible

Yanmar4TNV494,Engine power 37KW

bucket capacity 0.28m³

We are a real manufacturer, looking for agents all over the world.

6.5 Ton Crawler Excavator,6.5 Ton Excavator,Construction Machinery 6.5Ton Excavator,6.5 Ton Excavator Mini

Shandong Davoo Machinery Co., Ltd. Trading Company , https://www.sddigger.com